Correct installation and simple maintenance can double the service life of plastic extrusion profiles. This practical guide covers handling, fixing, cleaning and inspection intervals.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines plastic extrusion profiles by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include in-line printing and embossing; rigid, semi-rigid and flexible compounds; cut lengths from 50 mm. Materials most often specified are Acrylonitrile Butadiene Styrene, Polyvinyl Chloride, Polycarbonate, Polypropylene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the industrial packaging sector the decision is usually driven by drop protection and cost per pack, with recyclability as a secondary requirement. Typical end uses include protective foam, strapping, bulk containers.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
| High Density Polyethylene | 0.94-0.97 g/cm³ | 20-32 MPa | -50°C to 80°C |
| Thermoplastic Elastomer | 0.90-1.30 g/cm³ | 5-30 MPa | -40°C to 100°C |
Polyvinyl Chloride is frequently the default selection here: PVC can be formulated from rigid pipe compound to soft medical grade by changing plasticiser content.
Build these steps into your standard work instruction.
Outdoor service life depends mainly on the UV stabiliser package and the colour.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap