Importing plastic nets and meshes from China can cut unit cost substantially, but only if the specification, the tooling and the inspection plan are agreed before the first shipment.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines plastic nets and meshes by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include mesh 4 mm to 50 mm; shade rate 30% to 95%; width 1 m to 6 m. Materials most often specified are High Density Polyethylene, Polypropylene, Low Density Polyethylene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the construction and building sector the decision is usually driven by weather resistance and fire classification, with long service life as a secondary requirement. Typical end uses include insulation boards, formwork panels, window profiles.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| High Density Polyethylene | 0.94-0.97 g/cm³ | 20-32 MPa | -50°C to 80°C |
| Low Density Polyethylene | 0.91-0.93 g/cm³ | 8-20 MPa | -50°C to 70°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
High Density Polyethylene is frequently the default selection here: HDPE combines toughness with chemical inertness, which is why it dominates pipe and tank markets.
The landed cost of plastic nets and meshes is built from several layers:
Before placing an order, work through this checklist:
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap