Behind every consistent thermoformed part there is a controlled process. This article walks through sheet extrusion, heating, forming, trimming and the inspection steps that matter.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed point of sale display trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include counter and shelf formats; multi tier and stepped designs; stackable for transport. Materials most often specified are Polyvinyl Chloride, Recycled PET, Polyethylene Terephthalate, Polypropylene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the retail and merchandising sector the decision is usually driven by shelf presentation and print quality, with stack strength as a secondary requirement. Typical end uses include pegboard blisters, dump bins, counter displays.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Polyvinyl Chloride | 1.38-1.45 g/cm³ | 40-55 MPa | -10°C to 60°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
Polyethylene Terephthalate is frequently the default selection here: High IV PET resin is the reason a 1.5 L bottle can be light yet hold carbonation pressure.
The route below is the one most factories use for this type of part.
Critical control points are melt temperature, cooling time and the inspection of the first pieces of every shift. A stable process is documented with a parameter sheet that travels with the tool.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
If you are planning a new retail and merchandising project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap