Most quality claims on thermoformed parts trace back to a handful of root causes. Learn to recognise them on the drawing, in the tool and on the finished part.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines returnable and reusable thermoformed trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include gauge 1.5 to 6.0 mm; stack and nest configurations; standard footprints 400 x 600 mm. Materials most often specified are High Density Polyethylene, Polyethylene Terephthalate, Polycarbonate, Acrylonitrile Butadiene Styrene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the automotive and mobility sector the decision is usually driven by dimensional stability and heat resistance, with impact strength as a secondary requirement. Typical end uses include dunnage trays, commercial vehicle trim, interior panels.
Typical values for a general purpose grade are listed below; filled, stabilised and speciality compounds will differ.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
Polyethylene Terephthalate is frequently the default selection here: High IV PET resin is the reason a 1.5 L bottle can be light yet hold carbonation pressure.
These are the failure modes that generate the majority of complaints.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
The route below is the one most factories use for this type of part.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap