Unit price in thermoforming is dominated by material, cycle time and freight. Here is the full cost structure and the levers that actually move the number.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines pressure formed precision parts by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include undercut capable tooling; tighter tolerance than vacuum forming; sharp detail and crisp radii. Materials most often specified are Polypropylene, Polyethylene Terephthalate Glycol, Acrylonitrile Butadiene Styrene, Polycarbonate, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the electronics and electrical sector the decision is usually driven by ESD protection and dimensional accuracy, with cleanliness as a secondary requirement. Typical end uses include connector carriers, accessory blisters, component trays.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyethylene Terephthalate Glycol | 1.27 g/cm³ | 45-55 MPa | -40°C to 70°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| PC/ABS Alloy | 1.13-1.15 g/cm³ | 45-60 MPa | -30°C to 110°C |
Acrylonitrile Butadiene Styrene is frequently the default selection here: ABS is the default choice when a part needs a glossy, paintable, impact-resistant surface.
Understanding the cost structure makes supplier quotations comparable.
Ask your supplier to quote two gauges and two cavity layouts; the difference shows which lever is worth optimising for your volume.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Our team supplies pressure formed precision parts to electronics and electrical customers worldwide, with samples, material certificates and full inspection reports available before mass production.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap