Correct handling and storage protect the performance of thermoformed refrigerator liners and door panels from the factory to the packing line. This guide covers stacking, climate, static and inspection.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed refrigerator liners and door panels by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include gauge 1.5 to 4.0 mm; food contact inner surfaces; textured and smooth finishes. Materials most often specified are High Density Polyethylene, Acrylonitrile Butadiene Styrene, Polystyrene, Polypropylene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the industrial equipment sector the decision is usually driven by thick gauge capability and flare and fire rating, with paintability as a secondary requirement. Typical end uses include twin sheet panels, protective guards, machine housings.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
High Density Polyethylene is frequently the default selection here: HDPE combines toughness with chemical inertness, which is why it dominates pipe and tank markets.
Build these steps into your standard work instruction.
Keep a small stock of spares from the same production lot to avoid colour mismatch later.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
If you are planning a new industrial equipment project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap