Importing slide blister and sleeve packaging from China can cut unit cost substantially, but only if sheet grade, tooling and inspection are agreed before the first shipment.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines slide blister and sleeve packaging by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include printed card sleeves; sleeve and tray combinations; gauge 0.30 to 0.55 mm. Materials most often specified are Polyethylene Terephthalate, Polystyrene, Recycled PET, Polyvinyl Chloride, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the hardware and tools sector the decision is usually driven by puncture resistance and hanging strength, with visibility as a secondary requirement. Typical end uses include hand tool clamshells, garden tool packs, fixing packs.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyvinyl Chloride | 1.38-1.45 g/cm³ | 40-55 MPa | -10°C to 60°C |
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
Recycled PET is frequently the default selection here: Food-grade rPET requires a recognised recycling process plus solid-state polycondensation.
The landed cost of slide blister and sleeve packaging is built from several layers:
Before placing an order, work through this checklist:
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Each step below has its own control points, and skipping one of them is where most defects start.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap