Unit price in thermoforming is dominated by material, cycle time and freight. Here is the full cost structure and the levers that actually move the number.
This guide is written for engineers, purchasers and project managers who need a practical answer, not a resin data sheet.
This category covers a family of products rather than a single item. In practice a buyer defines vacuum formed prototype and short run parts by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include production intent materials; lead times of 5 to 15 working days; low cost machined or printed tooling. Materials most often specified are High Density Polyethylene, Acrylonitrile Butadiene Styrene, Polycarbonate, Polyethylene Terephthalate Glycol, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the home appliance sector the decision is usually driven by deep draw capability and chemical resistance to insulation foam, with surface quality as a secondary requirement. Typical end uses include machine covers, door panels, refrigerator liners.
Typical values for a general purpose grade are listed below; filled, stabilised and speciality compounds will differ.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Polycarbonate | 1.20 g/cm³ | 55-70 MPa | -40°C to 120°C |
Polyethylene Terephthalate Glycol is frequently the default selection here: PETG forms at lower temperatures and holds detail well, which is why it dominates medical trays.
These are the levers buyers can actually influence when negotiating a thermoformed part.
Ask your supplier to quote two gauges and two cavity layouts; the difference shows which lever is worth optimising for your volume.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
The route below is the one most factories use for this type of part.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap