Thermoforming rewards designs that respect how a heated sheet stretches. These rules prevent most tooling rework and most thickness complaints.
Everything here can be checked on a real sample before you commit to a production order.
This category covers a family of products rather than a single item. In practice a buyer defines thick gauge thermoformed machine housings by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include moulded in colour and post painted; textured and glossy surfaces; class A painted finishes. Materials most often specified are Polycarbonate, High Density Polyethylene, Polypropylene, Acrylonitrile Butadiene Styrene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the industrial equipment sector the decision is usually driven by thick gauge capability and flare and fire rating, with paintability as a secondary requirement. Typical end uses include machine housings, kiosk shells, equipment covers.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Polycarbonate | 1.20 g/cm³ | 55-70 MPa | -40°C to 120°C |
| PC/ABS Alloy | 1.13-1.15 g/cm³ | 45-60 MPa | -30°C to 110°C |
Polypropylene is frequently the default selection here: PP is the lightest mainstream packaging resin and keeps its shape under repeated flexing.
Thermoforming rewards designs that respect how the sheet stretches. These rules prevent most tooling rework.
Send these rules to your designer together with the sheet gauge and the target cycle time; most tooling modifications come from ignoring draft and corner radii.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Our team supplies thick gauge thermoformed machine housings to industrial equipment customers worldwide, with samples, material certificates and full inspection reports available before mass production.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap