Most quality claims on thermoformed parts trace back to a handful of root causes. Learn to recognise them on the drawing, in the tool and on the finished part.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed food trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include freezer grade to -20°C; barrier EVOH/PE structures; MAP and vacuum lidding options. Materials most often specified are Polystyrene, Polylactic Acid, Polypropylene, Recycled PET, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the logistics and warehousing sector the decision is usually driven by stackability and returnability, with traceability as a secondary requirement. Typical end uses include parts supermarket trays, bakey distribution crates, picking trays.
Typical values for a general purpose grade are listed below; filled, stabilised and speciality compounds will differ.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Recycled PET | 1.35-1.40 g/cm³ | 45-65 MPa | -40°C to 70°C |
| Polylactic Acid | 1.24 g/cm³ | 50-60 MPa | up to 55°C (HDT) |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
Polylactic Acid is frequently the default selection here: PLA is compostable in industrial facilities, not in a backyard heap, so label it carefully.
Each defect below has a root cause that can be removed at the design or tooling stage.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
If you are planning a new logistics and warehousing project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap