Unit price in thermoforming is dominated by material, cycle time and freight. Here is the full cost structure and the levers that actually move the number.
This guide is written for engineers, purchasers and project managers who need a practical answer, not a resin data sheet.
This category covers a family of products rather than a single item. In practice a buyer defines trapped blister carded packaging by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include single or twin cavity; card sizes to 250 x 400 mm; standard pegboard hole patterns. Materials most often specified are Polystyrene, Polyvinyl Chloride, Polyethylene Terephthalate, Recycled PET, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the electronics and electrical sector the decision is usually driven by ESD protection and dimensional accuracy, with cleanliness as a secondary requirement. Typical end uses include battery packs, component trays, connector carriers.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Recycled PET | 1.35-1.40 g/cm³ | 45-65 MPa | -40°C to 70°C |
| Polyvinyl Chloride | 1.38-1.45 g/cm³ | 40-55 MPa | -10°C to 60°C |
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
Polyvinyl Chloride is frequently the default selection here: PVC can be formulated from rigid pipe compound to soft medical grade by changing plasticiser content.
Unit price in thermoforming is dominated by material, cycle time and freight. Here is where the money goes.
Ask your supplier to quote two gauges and two cavity layouts; the difference shows which lever is worth optimising for your volume.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Our team supplies trapped blister carded packaging to electronics and electrical customers worldwide, with samples, material certificates and full inspection reports available before mass production.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap