Correct installation and simple maintenance can double the service life of agricultural plastic products. This practical guide covers handling, fixing, cleaning and inspection intervals.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines agricultural plastic products by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include mulch film 8 to 50 micron; silage and stretch film widths to 750 mm; shade net 30% to 95%. Materials most often specified are Polypropylene, Ethylene Vinyl Acetate, High Density Polyethylene, Polyvinyl Chloride, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the construction and building sector the decision is usually driven by weather resistance and fire classification, with long service life as a secondary requirement. Typical end uses include formwork panels, drainage pipe, window profiles.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Low Density Polyethylene | 0.91-0.93 g/cm³ | 8-20 MPa | -50°C to 70°C |
| High Density Polyethylene | 0.94-0.97 g/cm³ | 20-32 MPa | -50°C to 80°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
Low Density Polyethylene is frequently the default selection here: LDPE is the workhorse of flexible packaging because of its softness and sealing behaviour.
A few simple habits extend service life significantly.
Outdoor service life depends mainly on the UV stabiliser package and the colour.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Each step below has its own control points, and skipping one of them is where most defects start.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap