Construction and building buyers increasingly specify plastic pipes and tubes instead of metal, wood or glass. Here is where they are used, why they work, and what to watch out for.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines plastic pipes and tubes by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include coils and straight lengths; OD 16 mm to 630 mm; transparent and opaque options. Materials most often specified are Acrylonitrile Butadiene Styrene, Polyvinyl Chloride, Polyvinylidene Fluoride, Polycarbonate, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the construction and building sector the decision is usually driven by weather resistance and fire classification, with long service life as a secondary requirement. Typical end uses include formwork panels, drainage pipe, window profiles.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyvinyl Chloride | 1.38-1.45 g/cm³ | 40-55 MPa | -10°C to 60°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
Polyvinyl Chloride is frequently the default selection here: PVC can be formulated from rigid pipe compound to soft medical grade by changing plasticiser content.
The list below covers both high volume and specialised uses.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Our team supplies plastic pipes and tubes to construction and building customers worldwide, with samples, material certificates and full inspection reports available before mass production.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap