Importing slide blister and sleeve packaging from China can cut unit cost substantially, but only if sheet grade, tooling and inspection are agreed before the first shipment.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines slide blister and sleeve packaging by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include sleeve and tray combinations; printed card sleeves; gauge 0.30 to 0.55 mm. Materials most often specified are Recycled PET, Polyethylene Terephthalate, Polyvinyl Chloride, Polystyrene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the electronics and electrical sector the decision is usually driven by ESD protection and dimensional accuracy, with cleanliness as a secondary requirement. Typical end uses include connector carriers, device inserts, component trays.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Recycled PET | 1.35-1.40 g/cm³ | 45-65 MPa | -40°C to 70°C |
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
Polystyrene is frequently the default selection here: HIPS is the default thermoforming sheet for food packaging and appliance liners.
The landed cost of slide blister and sleeve packaging is built from several layers:
Before placing an order, work through this checklist:
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Each step below has its own control points, and skipping one of them is where most defects start.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
If you are planning a new electronics and electrical project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap