Most quality claims on thermoformed parts trace back to a handful of root causes. Learn to recognise them on the drawing, in the tool and on the finished part.
Everything here can be checked on a real sample before you commit to a production order.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed fruit and produce punnets by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include 250 g to 2 kg formats; vented base and side walls; gauge 0.30 to 0.70 mm. Materials most often specified are Polylactic Acid, Recycled PET, Polyethylene Terephthalate, Polypropylene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the food and beverage sector the decision is usually driven by food contact compliance and migration limits, with seal integrity as a secondary requirement. Typical end uses include takeaway containers, bakery inserts, fresh produce punnets.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polylactic Acid | 1.24 g/cm³ | 50-60 MPa | up to 55°C (HDT) |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Recycled PET | 1.35-1.40 g/cm³ | 45-65 MPa | -40°C to 70°C |
Recycled PET is frequently the default selection here: Food-grade rPET requires a recognised recycling process plus solid-state polycondensation.
Spotting these early saves rework, freight and reputation.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Each step below has its own control points, and skipping one of them is where most defects start.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
These are the criteria that actually predict whether the part will perform in service.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
If you are planning a new food and beverage project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap