Behind every consistent thermoformed part there is a controlled process. This article walks through sheet extrusion, heating, forming, trimming and the inspection steps that matter.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines clamshell blister packaging by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include tamper evident tear strips; full colour printed inserts; snap lock, button lock and RF seal closures. Materials most often specified are Polyethylene Terephthalate, Polystyrene, Polypropylene, Recycled PET, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the electronics and electrical sector the decision is usually driven by ESD protection and dimensional accuracy, with cleanliness as a secondary requirement. Typical end uses include component trays, device inserts, battery packs.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
Polypropylene is frequently the default selection here: PP is the lightest mainstream packaging resin and keeps its shape under repeated flexing.
Each step below has its own control points, and skipping one of them is where most defects start.
Critical control points are melt temperature, cooling time and the inspection of the first pieces of every shift. A stable process is documented with a parameter sheet that travels with the tool.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap