Correct handling and storage protect the performance of cleanroom thermoformed trays from the factory to the packing line. This guide covers stacking, climate, static and inspection.
Use it as a working checklist when you write your next enquiry.
This category covers a family of products rather than a single item. In practice a buyer defines cleanroom thermoformed trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include gauge 0.40 to 1.50 mm; laser marked identification; custom cavity matrices. Materials most often specified are Polycarbonate, Polypropylene, Polyethylene Terephthalate Glycol, Polyethylene Terephthalate, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the medical and pharmaceutical sector the decision is usually driven by validated sealing and sterilisation compatibility, with traceability as a secondary requirement. Typical end uses include IV and catheter kits, surgical kit trays, device trays.
These figures are typical for commercial grades and should be confirmed against the supplier's certificate for your specific lot.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
| Polycarbonate | 1.20 g/cm³ | 55-70 MPa | -40°C to 120°C |
Polyethylene Terephthalate Glycol is frequently the default selection here: PETG forms at lower temperatures and holds detail well, which is why it dominates medical trays.
A few simple habits extend service life significantly.
Outdoor service life depends mainly on the UV stabiliser package and the colour.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
The route below is the one most factories use for this type of part.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap