Thermoforming rewards designs that respect how a heated sheet stretches. These rules prevent most tooling rework and most thickness complaints.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed medical device trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include gauge 0.40 to 1.50 mm; rigid and semi rigid designs; custom cavity and instrument layouts. Materials most often specified are Polystyrene, Polycarbonate, Polypropylene, Polyethylene Terephthalate, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the electronics and electrical sector the decision is usually driven by ESD protection and dimensional accuracy, with cleanliness as a secondary requirement. Typical end uses include accessory blisters, component trays, device inserts.
The table below summarises the values that usually decide the material choice.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Polyethylene Terephthalate | 1.35-1.40 g/cm³ | 50-70 MPa | -40°C to 70°C |
| Polyethylene Terephthalate Glycol | 1.27 g/cm³ | 45-55 MPa | -40°C to 70°C |
| Polystyrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 70°C |
Polyethylene Terephthalate Glycol is frequently the default selection here: PETG forms at lower temperatures and holds detail well, which is why it dominates medical trays.
A few geometry decisions made on the drawing save weeks of tooling adjustment later.
Send these rules to your designer together with the sheet gauge and the target cycle time; most tooling modifications come from ignoring draft and corner radii.
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Processing method drives both cost and performance, so it should be fixed early in the design.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Work through these points in order and most specification mistakes disappear.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
If you are planning a new electronics and electrical project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap