Importing industrial dunnage and handling trays from China can cut unit cost substantially, but only if sheet grade, tooling and inspection are agreed before the first shipment.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines industrial dunnage and handling trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include stack and nest geometry; returnable and reusable designs; gauge 1.5 to 8.0 mm. Materials most often specified are High Density Polyethylene, Polycarbonate, Polypropylene, Polyethylene Terephthalate, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the industrial equipment sector the decision is usually driven by thick gauge capability and flare and fire rating, with paintability as a secondary requirement. Typical end uses include kiosk shells, equipment covers, protective guards.
Typical values for a general purpose grade are listed below; filled, stabilised and speciality compounds will differ.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| Acrylonitrile Butadiene Styrene | 1.04-1.06 g/cm³ | 30-50 MPa | -20°C to 80°C |
| Polycarbonate | 1.20 g/cm³ | 55-70 MPa | -40°C to 120°C |
| Polypropylene | 0.90-0.91 g/cm³ | 25-40 MPa | -10°C to 100°C |
Acrylonitrile Butadiene Styrene is frequently the default selection here: ABS is the default choice when a part needs a glossy, paintable, impact-resistant surface.
The landed cost of industrial dunnage and handling trays is built from several layers:
Before placing an order, work through this checklist:
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
Each step below has its own control points, and skipping one of them is where most defects start.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Standard production tolerance follows the relevant ISO or DIN tolerance class for the process; tighter tolerances are possible after machining or grinding, but they add cost. Define the tolerance only on the functional dimensions.
We can provide ISO 9001 quality system documentation, material certificates, RoHS and REACH statements, and where applicable food contact, flame retardancy or drinking water approvals. Tell us your target market and we will match the document set.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Standard packing is export cartons on fumigation-free pallets, with custom labelling, barcode and retail packing available. We also handle consolidated containers and door to door delivery.
If you are planning a new industrial equipment project, send us your drawing, annual volume and target properties, and we will come back with a material proposal, a tooling plan and a budget quotation.
Rubber & Plastics © 2026 All Rights Reserved. Yingnet.com — Global B2B trade platform for rubber & plastics manufacturers.
About Us | Contact Us | Help Center | Sitemap