Importing thermoformed sanitary ware and acrylic trays from China can cut unit cost substantially, but only if sheet grade, tooling and inspection are agreed before the first shipment.
The notes below come from day to day production and export work with overseas buyers.
This category covers a family of products rather than a single item. In practice a buyer defines thermoformed sanitary ware and acrylic trays by three things: the base resin, the format or dimension, and the performance or certification level it has to meet. Typical options in this category include gauge 3.0 to 8.0 mm; reinforced with fibreglass backing; bathtub and shower tray sizes. Materials most often specified are Polymethyl Methacrylate, High Density Polyethylene, Polycarbonate, Acrylonitrile Butadiene Styrene, and the choice between them changes stiffness, temperature resistance, chemical behaviour and price.
In the industrial equipment sector the decision is usually driven by thick gauge capability and flare and fire rating, with paintability as a secondary requirement. Typical end uses include machine housings, equipment covers, protective guards.
Typical values for a general purpose grade are listed below; filled, stabilised and speciality compounds will differ.
| Material | Density | Tensile strength | Service temperature |
|---|---|---|---|
| High Density Polyethylene | 0.94-0.97 g/cm³ | 20-32 MPa | -50°C to 80°C |
| Polycarbonate | 1.20 g/cm³ | 55-70 MPa | -40°C to 120°C |
| Polymethyl Methacrylate | 1.18 g/cm³ | 50-75 MPa | -40°C to 80°C |
Polycarbonate is frequently the default selection here: PC replaces glass where impact safety matters, but it needs a hard coat for abrasion resistance.
The landed cost of thermoformed sanitary ware and acrylic trays is built from several layers:
Before placing an order, work through this checklist:
Beyond the base resin, most suppliers offer UV stabilised, food contact, flame retardant, anti-static and recycled content versions of the same product. Ask which additive package is included, because it is often the difference between a part that lasts three years and one that lasts ten.
The route below is the one most factories use for this type of part.
Secondary operations such as printing, welding, machining and assembly are often cheaper to do in the same factory, and they reduce the risk of mismatch between components.
Use this checklist when comparing two or three supplier quotations.
Send this list to your supplier with the drawing and you will receive comparable quotations from every factory you contact.
Yes. Standard samples are normally free of charge and shipped within three working days; custom samples are charged at cost and credited against the first production order.
A new tool typically takes 25 to 45 days depending on cavity count and complexity, followed by T1 samples within one week. Existing tools can usually start production within 10 to 15 days of order confirmation.
Colour is controlled with a masterbatch reference approved by the customer, and every production lot is checked against the approved sample under standard lighting before shipment.
Yes. {mat1} is one of our regular materials for this item, and we can supply virgin, modified and certified grades with full traceability. Material certificates and test reports are issued per batch.
For standard sizes and colours the minimum is usually one pallet or one production run; for custom tooling the economic minimum depends on the tooling cost amortised over the expected volume. Send us your annual volume and we will calculate the break even point.
Share your specification and quantity with us and we will recommend the most cost effective material, tooling route and packing method for your market.
Rubber & Plastics-yingnet.com © 2026 All Rights Reserved. Yingnet.com style B2B marketplace template.
About Us | Contact Us | Help Center | Sitemap